On September 16, my friends and I attended the third lecture series organized by Nepalese Society of Engineering Geologists (NSEG) at the National Academy of Science and Technology (NAST). The first lecture of the series included a presentation titled, “Bara-Parsa Post Tornado Reconstruction—An Overview”. Lt. Col. Shrijan Bahadur Malla, the leader of the Parsa Karyadal (“Karyadal” translates to “task force/group”), showed through a series of slides the effects of tornado, the government’s response and the Nepal Army’s effort in accomplishing a near-impossible task within the given time-frame.
What had happened at Bara and
Parsa?
Between 7: 45 to 8: 15 PM, March 31, 2019 (Jestha 17, 2076), a storm swept through several villages of Parsa and Bara districts of Nepal. The reports that came since puzzled the scientists as such a wide range of destruction had never been reported before. The winds had travelled 90 km (30 km of which was observed from the satellite images) within 30 minutes, uprooted trees, overturned trucks and completely damaged some masonry buildings. The winds were stronger than what was usually observed. They had to dig deeper into what had actually happened.
Department
of Hydrology and Meteorology (DHM) had observed the possibility of rainfall in
the area, but due to lack of resources, had not been able to predict the nature
of the storm. On the other side of the border, India Meteorological Department
(IMD) had issued a warning against “chakravaat”. However, there was no official
information exchange between the DHM and IDM. So, we were completely unaware of
what was about to come.
A
week later, the Department of Hydrology and Meteorology (DHM) confirmed it was
a tornado, with intensity up to F2 and F3 (180-332 km/hr) on the Fujita Scale. The
actual speed could not be determined. The tornado had generated at the Chitwan
National Park and had travelled eastwards, reaching a maximum width of 200 m
and destroying everything that came in its way. Bharbalia, Parwanipur, and
Pheta villages of Bara suffered the worst. 28 people died (according to the
official report), about 1200 people sustained injuries, and around 1450 houses
were destroyed. Farmers also suffered the loss of crops and livestock.
Was it the first ever tornado that
occurred in Nepal?
Most
media and even among the scientists, the event was discussed as the first ever
tornado occurring in the Nepali territory. However, as someone with roots in
the Terai, and having heard accounts of hard-hitting storms from the past, I
don’t believe it was the first ever tornado. Still, it is the first time, a tornado
event has been recorded and studied scientifically. To confirm this further, I
would like to quote from Kiran Nepal from his article in the Nepali Times:
“The tornado was not the first of its kind in Nepal. In fact, literature and folklore speak of twisters ravaging Tarai villages. But because these are localised disasters, they did not make it to the news.”
(Ground zero in Pheta)
Response to the crisis
Government
of Nepal made a quick response. Rescue teams were immediately employed. On
April 1, the Government declared a state of emergency in the affected area.
Nepalese Army then got involved in the rescue and relief operation. All three
levels of Government—the Federal, Province No. 2 and Local Governments—worked
together to manage the relief works, and to rehabilitate the affected people
before the Monsoon hit them hard again.
So,
the Local Government brought up all the data necessary for the reconstruction
process, the Provincial Government facilitated the smooth operation, and the
Federal Government asked the Nepalese Army to complete the task as soon as
possible. On April 26, it was declared that the Nepalese Army would be involved
in the construction of new houses under the Janata Aawas Kaaryakram (People’s
Housing Programme).
Challenges to Nepal Army
Lt.
Col. Malla provided his first-hand experience on the challenges the Nepalese
Army had to face.
1. Timeframe
The task had to be completed within 3 months. The Local Governments had enlisted a total of 884 houses to be constructed. All the construction had to be parallel. They needed a lot of construction materials, required large areas to heap them until the construction. The need for human resources was also paramount.
2. Weather Condition
The summer was in its peak. The temperatures reached more than 40 degrees Celsius during the day time. Winds blew from time to time, destroying the temporary shelters, and floods delayed the construction.
3. Health Issues and Snake Bites
Heatstroke is among the common health issue in the summer. Flu is another illness that can occur because of the cold sweat drenching your clothes and skin. There is also high risk of malaria and Kala-Azar. Snake bites are also frequent occurrences. Lt. Col. Malla reported incidents of flu and snake bites.
4. Socio-political issues
When huge reconstruction work is at hand, most families separate so that they can enjoy the compensation provided. The number of victims fluctuated frequently and even at the end, there were issues related to citizenship and land-ownership.
How did the Army Complete the Task?
Nepalese
Army was provided with the design of houses by the Department of Urban Housing.
The design had two rooms, the frame and trusses were to be made from bamboo.
The Army changed it slightly. They added a verandah and a toilet. And instead
of bamboo, they would use steel.
With
the design in hand, they had to look for huge amounts of construction material.
The government had eased the process by letting the Army buy directly from the
market (instead of the usual bidding process). The contractors for construction
materials were chosen such that they could supply the materials required
without any corruption and commission.
Since
the task was labour intensive, they required to hire a huge labour force. It
was convenient to use the troops themselves. The Army personnel were divided
into the highly-skilled, skilled and semi-skilled and the work division was
done accordingly. They worked in shifts from 6 to 10 o’clock in the morning and
4 to 8 o’clock in the evening.
There
were some hurdles, as state in the section above. Nepalese Army went through
and helped themselves and the victims. They worked as smoothly as they could.
Finally, 869 of 884 houses were completed by the end of August. The remaining
15 houses were not built due to the issues such as citizenship and land
ownership. These houses were handed over to their respective owners officially
on 4th September.
Lessons Learnt
At the end of the
presentation Lt. Col. Malla presented a list of lessons learnt from the
Bara-Parsa Tornado event. I have added some by myself.
1. Improvement in
Weather Forecasts. The DHM and
IMD are now working together to identify such disasters. The weather forecasts
are also becoming increasingly reliable.
2. Where there is
will, there are ways. The
government’s response was quick. The Army was given the rights to final
decision on the construction. The buying of essential construction materials was
made easier. All there levels of government came together. The tiff between the
Federal Government and the Province-2 Government did not affect the victims.
3. Enhancement of the
capacity of the Nepalese Army.
From all sort of labour-intensive work to planning and design, the Army has
grown stronger, Lt. Col. Malla stated with pride.
4. Goodwill among the
people. All the government
bodies, and especially the Nepalese Army won the hearts of the people affected
by the tornado.
5. Civil authorities
need to play important roles in future disasters. As he concluded, Lt. Col. Malla said that
Nepalese Army cannot do all the reconstruction work by themselves in the
future. Though he was proud of what the Army had been able to do, it is the
task of civil authorities to actually involve in the disaster prevention, risk
reduction and reconstruction. Thus, they must be prepared to provide relief,
and for rehabilitation and reconstruction in the aftermath.
Conclusion
The presentation
brought out a sense of joy and pride in everyone present in the seminar hall.
It helped us understand what actually happens during the reconstruction. It’s
one thing to read and say, one should do this and that. But listening it from
someone who has had first-hand experience in the act, we knew how difficult the
task is. And how it feels to see smiling faces as the hard work comes to
fruition.
Many thanks to the
Government! Salute to the Nepalese Army!!
References
https://www.nepalitimes.com/latest/toll-expected-to-double-to-50-in-tornado
https://www.nepalitimes.com/here-now/groound-zero-in-pheta
https://www.nature.com/articles/d41586-019-01159-w
https://myrepublica.nagariknetwork.com/news/nepal-army-constructs-869-houses-for-tornado-victims-of-bara-parsa/
https://myrepublica.nagariknetwork.com/news/na-hand-over-houses-to-tornado-hit-bara-and-parsa-people/
https://en.wikipedia.org/wiki/March_2019_southern_Nepal_tornado